Safety for confectionery

Tehnohymycheskyy production control

Вторник, 10 2015 09 ноября: 59
Technochemical control of production in confectionery factories is carried out by the central (production) and workshop laboratories.

Packaging materials

Sunday, October 25 2015 08: 41
Packaging If the packaging does not make a good impression, buyers do not want to try the product. In 1950-ies. increasing the number of self-service stores with groceries, and therefore there was a need for packaging BIM. Prior to that, the product was stored and transported in stores with banks weighing about 14 pounds (about 6,5 kg), and then ...
Вимоги безпеки до кондитерських виробництв Карамельне та ірисне виробництво1.1. The cooling drum is guilty of the mother of the bunker, the capacity of which is turned on to the caramel machine with a carousel at a time when the machine is put into operation. Toothed wheels of the hunting machines are obedient to the mother of the earth and to the garden of the household with electrical plugs, roztashovaniyami by dagonali ogorodnenya.1.2. Robocha plate of the birch-bark table for caramel ...
Partial (galuzeva) 1. Wimogi bezpeki to ustatkuvannya confectionery vibrobnitsv1.1. Ustatkuvannya for podrіbennya, prosіyvannya ta zmіshuvannya sirovini ta napivfabrikativ1.1.1. Crushing-rozmelnoe udatkuvannya blame rozmishchuvatis izolovannomu primischenny. Місця виділення пилу (транспорттування, пересипання) повинні обладнуватись місcevimi vіssmoktovachami z poverimnym oschischennyam zapilenogo povіtrya before wikidannami at the atmosphere. Приміщення повине щозміни clean up. Perіодичність pribyrannya saw is installed ...

Conveyors

Sunday, April 08 2012 06: 01
Konveyery1.1. Construction of pipelines of all types must meet the requirements of GOST 12.2.022-80.1.2. Conveyors used for the transportation of dusty cargoes should be closed solid casing and equipped with local exhaust ventilation followed by purification povitrya.1.3. In the field of transfer of cargo transported from one conveyor to another (or machine) must be ne-redbacheni devices ...

Load - rozvantazhuvalnы work.

Sunday, April 08 2012 05: 38
Handling ROBOTY1. General vymohy1.1. Handling should Viko-nuvatys in accordance with the requirements of GOST 12.3.009-76, GOST 12.3.002-75, specifications and technical documentation approved by the state labor protection, and these Pravyl.1.2. Transport and hoisting means and mechanisms should comply with GOST 12.2.003-91.1.3. Electrical equipment, installation of electrical circuits and ground transportation and hoisting facilities must comply with the Operating Rules ...

Working with portable power tools

Sunday, April 08 2012 05: 17
1. Protecting buildings from blyskavky1.1. Designated buildings need to perform lightning protection and secondary displays it and its category, and the use of cable and rod Lightning - type of protection zones shall be determined in accordance with the requirements of RD 34.21.122-87.1.2. How grounding lightning protection can be used ...
Protective measures against electrical shock strumom1.1. To protect people against electric shock if damaged insulation must be applied for at least one of the following protective measures: grounding, vanishing, protective shutdown, distribution transformer, low voltage, double insulation, leveling potentsialiv.1.2. Grounding or vanishing electrical installations must be performed: - at voltage 380 in and ...

Electrical safety.

Saturday, April 07 2012 14: 15
ELEKTROBEZPEKA1. General vymohy1.1. Electrical safety of electrical consumers who have just built or reconstructed, should meet the requirements of consumers PUE.Elektroustanovky operated, must comply with the Operating Rules of electric installations of consumers and Rules technics safety during operation of electrical consumers and existing safety standards and regulations dokumentiv.1.2. Newly-built electrical installations and those that ...
Requirements for Vessels WORKING PRESSURE NOT MORE 0.07 IPA (0.7 KGS / cm) 1. General vymohy1.1. Inspection and maintenance vessels working under pressure less than 0.7 kg / cm, must be carried out in accordance with instructions approved vlasnykom.1.2. Vessels must vyhotovlyuvatys in companies that have the technical means to ensure their quality ...

Installation and repair of process equipment

Saturday, April 07 2012 12: 56
Installation and repair process ustatkuvannya1.1. Installation work on installation of technological equipment and repair work must comply with building regulations 3.05.05-84, SNIP III-4-80, standards and technical umovam.1.2. Installation and maintenance work must be carried out according to the design of these works (PVR) approved pidpryyemstva.1.3 owner. If necessary, use lifting tools during installation, ...
Requirements for the Design and Operation of water supply and sewerage 1. General vymohy1.1. Water and sewerage companies buildings should be made in accordance with the requirements of SNIP 2 04 0 85, snip 2.04.02-84, 2.04.03-85 SNP iHOST 12.3.006-75.1.2. In vcix types of buildings that are erected in canalized areas should include internal ...

Heating, Ventilation and Air Conditioning

Saturday, April 07 2012 11: 53
Heating, ventilation and air conditioning povitrya1. General polozhennya1.1. Ventilation, heating and air conditioning industrial, residential and administrative buildings, structures and buildings should provide for regular workplace and in the working area during the major maintenance and repair (auxiliary) works meteorological conditions (temperature, relative humidity and air velocity) and and concentration ...
Administrative and domestic buildings and prymischennya1. General arrangement vymohy1.1 Administrative and domestic buildings must comply with building regulations 209.04-87.1.2 Industry standards to ensure the sanitary facilities and equipments, sanitary characteristics of the processes listed in Annex 21.3. Square and equipment of sanitary facilities (dressing rooms, showers, drying, dust reduction, heating, cooling, toilets, washroom, devices, drinking water, etc) ...

Requirements for fencing and safety devices

Saturday, April 07 2012 09: 11
Requirements for safety fencing and prystroyiv1.1. All the moving, rotating and those that act, of equipment, auxiliary machinery if they constitute a source of danger for people should be securely fenced or placed so as to prevent injury to staff. Enclosures must be painted in colors according to GOST 12.4.026 - 76. ...
SAFETY REQUIREMENTS FOR PRODUCTION USTATKUVANNYA1. General vymohy1.1. The construction, installation, maintenance and operation of equipment must meet the requirements of GOST 12.2.003-91, GOST 12.2.032-78, GOST 12.2.033-78, GOST 12.2.062-81, GOST 12.2.124-90.1.2. The construction, manufacturing, installation, acceptance, operation and repair of vessels and devices that work under pressure over 0.07 MPa, shall comply with the Rules of construction and safe operation ...
Safety requirements for work performed in laboratoriyah1.1. The room is equipped laboratory exhaust cabinets with upper and lower suction and bumpers that prevent drainage of liquids on the floor. In laboratory premises, except zahalnoobminnoyi pryplyvno- exhaust and local exhaust ventilation of the laboratory cupboards should be for natural ventilation devices (vents, transoms). The velocity of the air at ...

Works in the middle of the container

Saturday, April 07 2012 07: 51
Works in the middle yemkosti1. For work inside the tanks must be appointed a team of at least 3-two persons (working, and alternate observer). Staying within the permitted capacity is usually one person. If necessary, stay in a capacity greater number of employees to be worked out, made to dress-admission and further implemented security measures ...
Safety requirements for processes and vyrobnytstva.1. General vymohy1.1. Production processes must be carried out in accordance with the requirements of these Rules and the current regulatory and technical documentation, approved in the established poryadku.1.2. Vybuhonebezpeky assessment and definition of explosion and fire hazard areas, buildings, structures determined at the design stage developer of the process according to the requirements ...
Warehouse budivli1. General vymohy1.1. Formulations including canopies, ramps, open storage platform for general purpose (finished goods, raw materials, semi-finished products and materials) must vid¬povidaty requirements 2.11.01-85 SNIP SNIP and 2.01.02-85 * .1.2. Warehouse storage cylinders filled with gas shall meet the requirements of the structure and safe operation of vessels working under pressure, and Regulation ...